Project: Turbine Controls Retrofit - 4 x 5MWeGas Turbine Electrical Generation

GTC International was contracted by the City of New York to provide a complete controls retrofit on four 5MWe gas turbine generator sets. This retrofit utilized state of the art GE PACS™ PLC technology combined with GE Cimplicity™ HMI graphical interface software. Installation of the controls, digital fuel metering system and vibration monitoring was designed, programmed, installed & commissioned by GTC International. This controls retrofit raised the facility start/run reliability from less than 50% to 100%.