Recent Projects

Project: 2 x Solar Taurus 70 Cogenerations Facility

GTC International was engaged to undertake the construction management & commissioning scope by Solar Turbines of San Diego, CA for the installation of a cogeneration facility located at an world renowned university campus in eastern Ontario. This project involved the installation of two Solar Taurus 70 gas turbines each connected to a Deltak HRSG. Due to severe space restrictions, GTC developed unique rigging measures to facilitate the insertion of the various pieces of equipment into their final locations. Electrical connection to the utility was completed via a 300m ductbank to the main substation cut into 5m of limestone bedrock.